High River, AB: A temporary road closure is anticipated at July 2nd and 3rd, 2014 on 12A Avenue SE, High River. The work, which is part of the Town’s Infrastructure Program, is needed to repair the road due to damage resulting from the 2013 flood and consequent heavy truck traffic. The work, which includes repaving the road, is expected to require the road to be closed for two days. Detour signs will be in place during this short interruption and 9 Avenue SE will be open as an alternate route. Drivers are reminded to watch for trucks and workers and to obey all safety signs and closures throughout town. Please be aware that barricades will be in place for public safety and will be left in place for lane closures even though construction crews may not be present.
Updates will be posted on the Town of High River website, www.highriver.ca, the Town’s Facebook (www.facebook.com/highriver.ca) and Twitter accounts (@TownOfHighRiver) and in the Town Crier.