HIGH RIVER, AB: Crews from ATCO Gas will be repairing a tee in the pipe at 423 5 Avenue S.E. and will require a road closure of 5 Avenue S.E. from Monday, December 7 until Friday December 11.
The road will be closed to vehicles and pedestrians allowing local traffic only between 4 Street and 5 Street S.E. There will be no parking permitted in the area to allow crews to stage their equipment and vehicles.
Please reduce speed, use caution and watch for work crews when travelling through the area.