Gateway Gazette

High River Road Closure at 5 Avenue S.W.

 

HIGH RIVER, AB: There will be a road closure on 5 Avenue S.W. between 8 Street S.W. and 9 Street S.W. starting Monday, Apr. 27 for approximately three weeks (weather dependent).

Bow Mark Paving will be installing concrete drainage swales to facilitate overland storm water drainage in the area.

Access to 5 Avenue S.W. will be available through alleys. There will be no access to 5 Avenue S.W. by 8 Street S.W. or 9 Street S.W.

Residents are asked to obey posted signage and watch for crews working in the area.

Map_of_Downtown_Businesses_Nov_7-_2014

Related Articles

Leave a Reply